CEE Relays Ltd.

87C Whitby Road, Slough, SL1 3DR

Telephone: (01753) 576477        Fax: (01753) 825661

Website: www.ceerelays.co.uk

 

 

 


IEC61363 Study Module

The IEC_61363 Short Circuit Study calculates the three-phase short-circuit duties in an unmeshed electrical power system operating at 50Hz or 60Hz. It represents conditions that may affect typical marine or offshore installations more significantly than land-based systems, including more emphasis on generator and motor decay.

The primary reasons for performing IEC61363 short-circuit calculations include:

  1. Obtain the short-circuit current magnitude at each point in the power system;
  2. Compare the calculated fault current to the ratings of installed equipment to verify that the equipment ratings are adequate to handle the short circuit current;
  3. Support proper selection of circuit protection equipment for protection and coordination.

Download the brochure in PDF format:

      IEC61363.pdf (89kB)

Download Acrobat Reader - version 5.0 (or above) required.


Copyright © 2002-2006 CEE Relays Ltd.

 

[ Home ]

[ Contact Us ] [ FAQs ] [ PTW FAQs ] [ Download ]