CEE Relays Ltd.

87C Whitby Road, Slough, SL1 3DR

Telephone: +44 1753 576477        Fax: +44 1753 825661

Website: www.ceerelays.co.uk

 

 

 


PTW IEC_61363 Short Circuit Study Module

The IEC_61363 Short Circuit Study module calculates the current that flows in an electrical power system under abnormal conditions. These currents must be calculated in order to adequately specify electrical apparatus withstand and interrupt ratings and selectively coordinate time current characteristics of electrical protective devices.

The IEC_61363 Short Circuit study represents conditions that may affect typical marine or offshore installations more significantly than land-based systems, including more emphasis on generator and motor decay.

The calculation methods are intended for use on unmeshed three-phase AC systems operating at 50Hz or 60Hz; having any system voltage specified in IEC 60092-201 table 2; having one or more different voltage levels; comprising generators, motors, transformers, reactors, cables and converter units; having their neutral point connected to the ship’s hull through an impedance; or having their neutral point isolated from the ship’s hull.

Benefits:

bullet Save time by easily obtaining the short circuit magnitude at each point in the power system.
bullet Design safer systems by comparing the calculated fault current to the ratings of installed equipment.
bullet Increase design reliability by supporting proper selection of circuit protection equipment for protection and coordination.
bullet Reports AC and DC current for 4 user defined times.
bullet Reports zero crossing time of total current.

Interface Options:

bullet Using Existing IEC60909 input data with minimum IEC61363 specified data required.
bullet Study report options to include different levels of calculation detail.
bullet Options to use Load Flow Results, Per Unit U0 (I0=0), or Rated U0 and I0 as the initial voltage and current.

Download the brochure in PDF format:

      IEC61363.pdf (89kB)

Download Acrobat Reader - version 5.0 (or above) required.


Copyright © 2002-2008 CEE Relays Ltd.

 

[ Home ]

[ Contact Us ] [ FAQs ] [ PTW FAQs ] [ Download ]