CEE Relays Ltd.

87C Whitby Road, Slough, SL1 3DR

Telephone: +44 1753 576477        Fax: +44 1753 825661

Website: www.ceerelays.co.uk

 

 

 

Arc Flash Evaluation Studies

PTW Arc Flash Evaluation calculates the incident energy and arc flash boundary for each location in a power system. Arc Flash saves time by automatically determining trip times from the protective device settings and arcing fault current values. Incident energy and arc flash boundaries are calculated following the NFPA 70E and IEEE 1584 standards. Clothing requirements are specified from a user-defined clothing library. Clearing times can be automatically reduced based on current-limiting capabilities.

 

Benefits:

bullet

Avoid fires, lost productivity, and litigation costs.

bullet Design safer power systems while insuring compliance with NEC 110.16,OSHA, NFPA 70E and IEEE 1584 standards. Save time with the fully integrated Short Circuit, Over-Current Coordination, Equipment Evaluation, and Arc Flash Evaluation modules working together with libraries of clothing levels, protective devices, and bus ratings.
bullet Provide a safer working environment by specifying the proper level of clothing. Wearing inadequate clothing is dangerous for obvious reasons, but wearing too much clothing is dangerous due to limited mobility and visibility.
bullet Evaluate alternatives quickly and easily, to establish an optimal design.
bullet Improve safety margins with user-definable arcing fault tolerances.
bullet Save time by automatically generating arc flash labels and work permits.
bullet Avoid potential fines, lost productivity, and increased insurance and litigation costs.

Interface Options:

bullet Simple to use tabular interface for system design, PPE selection, and reviewing study results.
bullet Summary and detail view enables complete bus by bus examination of study data.
bullet Pre-populated library of protective clothing allows user-defined PPE additions.
bullet Bus and branch arcing fault values are automatically calculated and trip times are automatically determined from the protective device settings.
bullet Arc Flash labels are automatically produced to comply with NEC 110.16 labelling requirements and can be printed to several standard size label sheets.
bullet Create custom labels in any size with user-defined logos, text, comments, field placement, and local language support.
bullet Report selected bus locations using custom queries or go-to function.
bullet Full featured reporting including bus report, line-side report, and load-side report.

Study Options:

bullet Option to follow the NFPA 70E or IEEE 1584 standards.
bullet Option to report in Imperial or metric units.
bullet Fuses and breakers may be modelled as current limiting devices with user-defined equations.
bullet Allows representation of differential, zone-interlocking, photo-sensing, and other special instantaneous protection schemes.
bullet Induction motors can be included, excluded, or included for a user-defined time.
bullet Automatically accumulates energy from parallel contributions that clear at different times.
bullet Compare results from multiple project scenarios in a single table.
bullet Option to check upstream protective devices for mis-coordination.
 
Arc Flash versus Arc Calc.
 
Download the brochure in PDF format:
 
      ArcFlash.pdf (152kB)
 